MainTasc

Make it easy

Make it easy

Key Insights

MainTasc is a leading software solution for Turnaround planning and management, ensuring projects run safely, on time, and on budget. SAP and Primavera P6 are powerful, but they weren’t specifically designed for Turnaround projects.

 

That’s where MainTasc comes in. We don’t replace your existing systems, we enrich them, adding the specialized tools and insights needed for Turnaround preparation, execution, and aftercare.

 

With bidirectional data exchange, MainTasc bridges the gaps between systems, giving you:

  • Complete visibility across SAP, Primavera P6, and Microsoft Project
  • Enhanced planning and scheduling tools tailored for Turnarounds
  • Seamless integration without disrupting your workflows

 

MainTasc transforms your existing setup into a Turnaround powerhouse, combining deep integration with specialized expertise.

Flexibility

Adapt to your process

Scalability

Small to large projects

Accessible

User friendly

User oriented

Total process

Initiation

Preparation

Execution

Benefits

MainTasc isn’t just about managing tasks, it’s about unlocking smarter ways of working. From reducing downtime to improving team coordination and cutting costs, these benefits show how MainTasc delivers real impact where it matters most.

Efficiency

Cost Savings

Productivity

User Satisfaction

Explore Our Modules per phase

Each phase of your maintenance or turnaround journey is supported by purpose-built modules that simplify complexity, boost collaboration, and drive results. Dive into the phases and discover how Maintasc helps your team stay ahead, every step of the way.

Initiation

Data

Projects

Planning

Projects

Scoping

Scope

Planning

Contracting

Material Management

Cost Controlling

Dashboard

Execution

Scope Changes

SafeGuard

Material Management

Scheduling

Permits

Quality Management

Digital Wallpaper

Close Out

Quality Mangement

Reports

Reports

Process

DokPlan simplifies the entire workflow, from initial preplanning to final payroll processing. Thanks to its intuitive modular design, every team member can easily manage their part of the process, ensuring smooth collaboration.

Masterdata

Functional Locations / Equipments
Documents
Technical specifications

Objects / Equipments

Gatekeeping

Work requests

Gate keeping

Scoping

Work Orders

Scope

TCC
Estimates

Routing

Planning / Work Preparation

Work description

Planning
Materials
Calculations

Outsourcing / Contracting

Outsourcing

Quotation

Contractor

Material Management

Bagging and Tagging

Warehouse

Cost Controlling

Purchase
CAPEX / OPEX

Cost control
Budget

Scheduling

P6

Primavera

Execution

All MainTasc modules

Discover More

Ready to explore our application in depth? Reach out for a demo, request more information, or dive into our detailed insights.

Contact us

+32 3 295 17 00

Palieterdreef 53

2280 Grobbendonk

Belgium

hello@blueit.eu

Feature information

Functional Locations

Functional Locations represent the physical or logical locations within a plant where work is performed. They are used to structure and organize equipment and tasks hierarchically.

01 FUNCTIONAL LOCATIONS

Feature information

Equipments

Equipments are individual assets linked to functional locations. They can be tagged, categorized, and associated with tasks, documents, and risk assessments.

02 EQUIPMENTS

Feature information

Documents

Documents can be linked to any object, equipment, or scope item. They support versioning and categorization, and can be stored as files.

core-dev.maintasc.com_c_MTE_DEV_PROD_Site_Document_Index

Feature information

Importers

Importers allow bulk master data upload into MainTasc, including functional locations, equipment’s, material catalogues, spare part lists (or Bill of Materials), and document metadata. This streamlines initial setup and integration with external systems.

apps-dev.maintasc.com_c_MTE_DEV_PROD_Data_Imports_Index

Feature information

Site

Sites define the geographical or operational boundaries within which plants and projects are managed. Each site can host multiple plants and libraries.

Feature information

Library

Libraries contain reusable elements such as standard activities, templates, materials, and vendor lists. They ensure consistency across projects.

Feature information

Plant

Plants are operational units within a site. Each plant includes its own functional locations, equipment’s, technical- and project data.

Feature information

Security Roles

Security Roles define user permissions and access levels across modules. They ensure data integrity and controlled access to sensitive information.

core-dev.maintasc.com_c_MTE_DEV_PROD_Site_SecurityRoles_Index

Feature information

Security

This feature allows administrators to assign roles, manage user groups, and configure access to specific modules and data layers.

core-dev.maintasc.com_c_MTE_DEV_PROD_Site_UserGroup_Index

Feature information

Settings

Settings allow customization of the MainTasc environment, including general settings and project specific settings.

10 SETTINGS

Module information

Data

The Initiation module in MainTasc serves as the foundation for setting up project environments. It allows users to define core data structures such as site, plants, libraries and security roles. This module ensures that all essential elements are in place before scoping and planning begin.

Key Features

Actions

Functional Locations

Equipments

Documents

Importers

Site

Library

Plant

Security Roles

Applications

Security

Settings

Feature information

Status workflow

The status workflow feature enables users to define and manage the lifecycle of a project. Each status can trigger specific actions, permissions, or notifications, ensuring consistent project governance.

White:   (Lead)planners 

Green:  SHE

Red:   Leadplanners 

Yellow:  TAR manager

Orange:   Operations

Picture1

Feature information

General

Functional Locations represent the physical or logical locations within a plant or site where work is performed. They are used to structure and organize equipment and tasks hierarchically.

01 FUNCTIONAL LOCATIONS

Feature information

Scope Change

This application allows users to submit, review, and approve scope changes during the project lifecycle. It supports attachments, estimates, and approval tracking to ensure transparency and control.

apps-dev.maintasc.com_c_MTE_DEV_PROD_ScopeChange_prjId=4&scoID=397&code=10201A&type=0

Feature information

Permits

This application supports field-level permit handling, including scanning scope items, selecting tasks, and printing permits. It is optimized for touchscreen use and integrates with progress tracking and inspections.

04 PERMITS

Feature information

Progress

This application enables real-time progress tracking of tasks and activities. Users can report status updates, add comments, and view historical progress data.

apps-dev.maintasc.com_c_MTE_DEV_PROD_Progress_prjId=4&scoID=397&code=10201A&type=0

Module information

Projects

The Projects module in MainTasc is the central hub for managing all project-related data. It allows users to configure project settings, define workflows, and link applications such as Permits, Progress, and Scope Changes. This module ensures that each project is structured correctly and ready for execution.

Key Features

Actions

Status Workflow

Configuration

General

Applications

Scope Change

Permits

Progress

Feature information

Overview

The overview provides a structured view of all scope items and their planning status. It includes filters, status indicators, and links to related documents.

Overview

Feature information

Documents

Documents can be attached in several places, such as to scope items, activities, disciplines, material lines and cost lines. They support versioning and categorisation, and are used for instructions, specifications, and compliance.

Documents

Module information

Projects

The Planning module in MainTasc enables detailed planning of scope items. It supports the creation of work descriptions, resource assignments, task risk analyses, and material lists. This module ensures that every task is fully defined and ready for execution, with all necessary documentation and calculations in place.

01 OVERVIEW

Key Features

Actions

Overview

Documents

Feature information

Overview

Provides a centralized view of all scope items, including their status, origin, and associated metadata. Users can filter, sort, and group scope requests for efficient review.

01 OVERVIEW

Feature information

Gatekeeping

Gatekeeping ensures that scope items meet predefined criteria before being accepted. It uses a risk matrix and approval workflow to validate technical, safety, and budgetary aspects.

Feature information

Scoping importer

Allows bulk import of scope items from external sources such as Excel or SAP. This feature streamlines the intake process and reduces manual entry.

Feature information

Task Risk Analysis

TRA’s enable planners to assess and document risks associated with each task. It supports structured input and can use default templates.

06 TASK RISK ANALYSIS

Feature information

Routing (Scoping)

Scoping routing defines the path a scope item follows during intake and validation. It includes steps for technical review, safety checks, and budget alignment.

Routing (Scoping)

Module information

Scoping

The Scoping module in MainTasc is designed to capture, evaluate, combine and structure all scope requests. It supports risk assessments, gatekeeping workflows, and routing mechanisms to ensure that only validated and approved scope items proceed to planning. This module is essential for maintaining control and transparency during the early stages of a project.

Overview

Key Features

Actions

Overview

Gatekeeping

Scoping Importer

Risks Assessments

Routing (Scoping)

Feature information

Overview

Displays all scope items in a centralized view, including status, type, and associated metadata. Users can filter, group, and sort scope items for efficient navigation and control.

Overview

Feature information

Scope importer

Allows bulk import of scope items from external systems or spreadsheets. This feature supports mapping fields and validating data before integration.

Feature information

Scope Changes

Enables users to log and manage changes to scope items during the project lifecycle. Includes attachments, estimates, and approval workflows to ensure traceability.

apps-dev.maintasc.com_c_MTE_DEV_PROD_ScopeChange_Overview_Index

Feature information

Facility Scope

Defines scope items at the facility level, allowing grouping by plant, area, or system. This helps in organizing work packages and aligning with operational boundaries.

Facility Scope

Feature information

Project Scope

Represents scope items specific to a project. These items are linked to planning, budgeting, and execution workflows, ensuring full traceability.

Project Scope

Feature information

Routing (TTC)

Technical Task Clarification (T.T.C.) routing allows scope items to be reviewed and enriched by various departments. It ensures all necessary input is gathered before gatekeeping.

Routing (TTC)

Feature information

Routing (Planning)

Defines the workflow for scope items as they move into the planning phase. Includes steps for assigning planners, verifying data, and preparing work descriptions.

Routing (Scoping)

Module information

Scope

The Scope module in MainTasc provides a structured environment to manage all approved scope items. It supports detailed breakdowns, categorisation, and linking to planning, execution, and reporting modules. Scope items can be enriched with technical specifications, planning data, task risk analyses, and documentation to ensure readiness for execution.

Overview

Key Features

Actions

Overview

Scope Importer

Scope Changes

Facility Scope

Project Scope

Routing (TTC)

Routing (Planning)

Feature information

Overview

Displays all scope items with their planning status, assigned planners, and completeness indicators. Filters and grouping options help prioritize and manage workload.

Overview

Feature information

Work Description

Defines the tasks to be performed, including activities, resources assignment, and dependencies. Supports templates, long text, and step-based detailing for clarity and precision.

02 WORK DESCRIPTION

Feature information

Disciplines

Disciplines are automatically generated based on assigned resources and can be manually adjusted. Here planners can define clear instructions of all disciplines involved.

03 DISCIPLINES

Feature information

Norm Rate Calculations

Calculates expected durations and costs using standardized norm tables. Includes support for scaffold-specific calculations and correction factors.

04 NORM RATE CALCULATIONS

Feature information

Materials

Materials can be added from article catalogs, copied form previous projects, or manually entred. They are linked to activities and steps, and can be tracked throughout the project lifecycle.

05 MATERIALS

Feature information

Documents

Documents can be attached to scope items, activities, disciplines and material lines. They support versioning and categorization, and are used for instructions, specifications, and compliance.

Documents

Feature information

Check Planning

Validates the completeness and consistency of planning data. Checks for faulty data, unlinked resources, unresolved dependencies and missing documentation before moving to execution.

core-dev.maintasc.com_c_MTE_DEV_PROD_Site_CheckPlanning_Index

Module information

Planning

The Planning module in MainTasc is where scope items are transformed into executable work packages. It supports detailed task descriptions, resource assignment, risk analysis, material requirements, documents and cost estimation. This module ensures that all necessary information is captured and validated before execution begins.

02 WORK DESCRIPTION

Key Features

Actions

Overview

Work Description

Disciplines

Norm Rate Calculations

Materials

Task Risk Analysis

Documents

Check Planning

Feature information

Overview

Displays all supplier-related activities, including status of quotations, approvals, and linked scope items. Filters and grouping options help manage multiple supplier efficiently.

Overview

Feature information

Transmittals

Transmittals are collections of planned scope per suppliers. Transmittals include all the information a supplier needs to provide a quotation, such as technical specifications, planning data, and safety requirements.

Transmittals

Feature information

Contractor

This application allows suppliers to digitally interact with MainTasc. Suppliers can submit quotations, provide feedback, and access assigned work packages securely.

CONTRACTOR

Module information

Contracting

The Contracting module in MainTasc facilitates the digital management of contractor interactions. It allows you to create tailor-made handover packages for each contractor, request quotations, and approve tenders. This module streamlines the outsourcing process and ensures that contractors are aligned with project scope, planning, and safety requirements.

Overview

Key Features

Actions

Overview

Transmittals

Applications

Contractor

Feature information

Materials

Provides quick access to material-related functions such as adding items, importing/exporting lists, and linking materials to activities or steps.

Materials

Module information

Material Management

The Material Management module in MainTasc provides full control over the materials required for project execution. It supports the creation of material lists, tracking of deliveries, and integration with warehouse operations. This module ensures that materials are available, traceable, and correctly assigned to tasks and scope items.

Materials

Key Features

Actions

Materials

Feature information

Overview

Displays all cost-related data per scope item, including budget status, committed costs, and actuals. Filters and grouping options help cost engineers monitor financial performance.

Overview

Feature information

Budgets

Allows users to define and manage project budgets, including CAPEX/OPEX allocations. Supports multiple budget versions and comparison scenarios.

Budgets

Feature information

Cost Baselines

Establishes reference points for cost tracking. Baselines can be used to measure deviations and support forecasting.

Cost Baselines

Feature information

Purchasing

Integrates with procurement workflows, allowing users to link cost lines to purchase requests, orders, and invoices. Supports vendor selection and quotation tracking.

Purchasing

Feature information

Work Breakdown Structure

Supports hierarchical cost tracking by linking scope items to WBS elements. Enables structured reporting and alignment with financial systems.

Work Breakdown Structure

Module information

Cost Controlling

The Cost Controlling module in MainTasc provides comprehensive tools to manage project budgets, track expenditures, and compare estimates with actuals. It integrates with purchasing workflows and supports detailed cost breakdowns per scope item, resource, and material. This module ensures financial transparency and control throughout the project lifecycle.

Budgets

Key Features

Actions

Overview

Budgets

Cost Baselines

Purchasing

Work Breakdown Structure

Feature information

Project Progress

Displays the current status of all scope items and activities. Progress is visualized using bar charts, percentages, and traffic-light indicators, helping teams quickly assess execution status.

Project Progress

Module information

Dashboard

The Dashboard module in MainTasc provides a real-time visual overview of project performance. It displays key metrics such as progress, scope changes, and safety status using customizable widgets, graphs, and S-curves. Dashboards can be tailored per user or role, offering instant insights into project health and execution status.

Project Progress

Key Features

Actions

Project Progress

Feature information

Scope Changes

Allows field teams to log scope changes directly from the worksite. Users can add photos, descriptions, and estimates, and follow up on approvals. This ensures that deviations are documented and controlled.

apps-dev.maintasc.com_c_MTE_DEV_PROD_ScopeChange_prjId=4&scoID=397&code=10201A&type=0

Module information

Scope Changes

The Execution module in MainTasc ensures that planned work is carried out safely, efficiently, and transparently. It provides tools for tracking progress, managing scope changes, and coordinating field activities. This module bridges planning and real-time operations, enabling teams to monitor execution and respond to changes dynamically.

Key Features

Applications

Scope Change

Feature information

Manage unique Blind Locations

SafeGuard allows you to register unique blind locations within the plant. Each blind location can be foreseen from technical information, which can be used to create, plan and execute safety lists.

Manage Unique Blind Locations

Feature information

Create Safety List templates

Safeguard gives you the option to create templates as the basis for repetitive operations to similar equipment’s. This will make the creating of safety lists easier and reduces faults in safety lists.

Create Safety List templates

Feature information

Execute Safety Lists using mobile devices

During the execution of the project, the status of the blind locations can be monitored using mobile devices. This allows instant feedback of changes to active safety lists and assures that work can continue safely.

Execute Safety Lists using mobile devices

Module information

SafeGuard

Safety is our highest priority. Safeguard makes sure that jobs can be executed in a safe environment.

Execute Safety Lists using mobile devices

Key Features

Actions

Manage unique Blind Locations

Create Safety List templates

Execute Safety Lists using mobile devices

Feature information

Overview

Displays all materials linked to execution tasks, including delivery status, location, and usage. Helps warehouse teams coordinate handovers and track consumption.

apps-dev.maintasc.com_c_MTE_DEV_PROD_Warehouse_LocationManagement_Index

Feature information

Warehouse

The Warehouse application supports real-time material handling during execution. It includes features for receiving, issuing, and tracking materials per job or task.

apps-dev.maintasc.com_c_MTE_DEV_PROD_Warehouse_Overview_Index

Module information

Material Management

Provides tools for managing materials during execution, including receiving, bagging & tagging, and issuing. It ensures that materials are available at the right time and place, and that usage is tracked accurately.

Key Features

Actions

Overview

Applications

Warehouse

Feature information

Overview

Displays the full project schedule, including task dependencies, durations, and progress. Users can filter by scope item, discipline, or status.

Overview

Feature information

P6 Importer

Allows users to import schedule data from Oracle® Primavera P6. Supports mapping of activities, resources, and relationships to MainTasc scope items.

Feature information

P6 Exporter

Enables export of MainTasc planning data to Oracle® Primavera P6. Ensures consistency between internal planning and external project controls.

Feature information

P6 Progress Importer

Imports progress updates from Oracle® Primavera P6 into MainTasc. This keeps internal dashboards and KPIs aligned with external reporting.

Feature information

P6 Progress Exporter

Exports progress data from MainTasc to Oracle® Primavera P6. Useful for updating external schedules with real-time execution feedback.

Feature information

MPS Importer

Imports schedule data from Microsoft® Project. Supports activity mapping and resource alignment for seamless integration.

Feature information

MPS Exporter

Exports MainTasc planning data to Microsoft® Project. Ensures that external schedules reflect the latest internal planning.

Feature information

Progress

Provides tools for tracking task progress in real time. Users can update status, add comments, and view historical performance.

apps-dev.maintasc.com_c_MTE_DEV_PROD_Progress_prjId=4&scoID=397&code=10201A&type=0

Feature information

Look Ahead

Generates forward-looking reports to identify upcoming tasks, required permits, and inspections. Helps teams prepare proactively.

Look Ahead

Module information

Scheduling

The Scheduling interfaces in MainTasc enables seamless integration with external planning tools such as Oracle® Primavera® P6 and Microsoft® Project. It supports import/export of schedule data, progress updates, and lookahead planning. This module ensures that project timelines are synchronized and that execution teams have access to accurate, real-time schedule data.

Look Ahead

Key Features

Actions

Overview

P6 Importer

P6 Exporter

P6 Progress Importer

P6 Progress Exporter

MSP Importer

MSP Exporter

Applications

Progress

Look Ahead

Feature information

Overview

Displays all active and historical permits, including status, associated tasks, and risk levels. Users can filter by date, scope item, or permit type.

Overview

Module information

Permits

The Permits module in MainTasc enables the creation, management, and printing of work permits based on planning data. It ensures that all safety and compliance requirements are met before work begins. The module supports kiosk mode for field use, QR code scanning, and digital workflows for permit approval and tracking.

04 PERMITS

Key Features

Actions

Overview

Applications

Permits

Feature information

Inspections

Allows users to perform field inspections, approve or reject work, and add comments or photos. Inspection results are linked to scope items and can trigger follow-up actions.

apps-dev.maintasc.com_c_MTE_DEV_PROD_Inspections_prjId=4&scoID=397&code=10201A&type=0

Module information

Quality Management

The Quality Management module in MainTasc ensures that all work is executed according to predefined standards and safety protocols. It supports inspections, punch lists, and final acceptance workflows. This module helps teams maintain compliance, track quality issues, and close out work packages with confidence.

Key Features

Actions

Inspections

Feature information

Multiple layouts

Based in planning data, a digital wallpaper can be created, displaying all jobs and their work in each project phase: pre turn around,  shutdown, execution, commissioning, start-up, and post turn around. You can create and save as many layouts as you like and load them whenever required. This allows you to display a specific project phase or to hide information when not needed.

Feature information

□ Accept tasks with a touch monitor

The digital wallpaper can be displayed on touch screen monitors, which allow you the progress activities for each job by simply clicking on a cell. You can also extract information by clicking on the job header and view the status of an entire job.

Feature information

Register real-time progress

The digital wallpaper also displays progress reported via mobile devices in the field in nearly real-time. Has an activity been reported as completed in the field? The related cell in the wallpaper will change colour to reflect the current status.

Feature information

Powerful project dashboard

Using colours, the digital wallpaper can be used as a powerful dashboard to present the status of each job. The colours represent the statuses not started, in progress, Completed, Planned today, nearly overdue or overdue. This allows a quick overview of the current status of each job.

Powerfull Project Dashboard

Feature information

Enhanced Filtering

The Digital Wallpaper allows you to use filter slices based on the data for the wallpaper. This will allow users to easily create filters on area, system, type of equipment’s, foremen and much more. The Digital Wallpaper also allows you to filter on the scheduled dates, so that you can filter on all jobs planned for the current day or next days.

Enhanced Filtering

Module information

Digital Wallpaper

Easy digital acceptance and progressing of work tasks. This together with a real-time overview of a projects progress.

01 ABSENCES

Key Features

Applications

Multiple Layouts

Accept tasks with a touch monitor

Register real-time progress

Powerful project dashboard

Enhanced Filtering

Module information

Quality Management

The Close Out module in MainTasc ensures that all remaining tasks, quality checks, and documentation are finalized before project completion. It supports punch list management, final inspections, and handover workflows. This module helps teams wrap up projects in a structured and compliant manner, ensuring nothing is left behind.

Feature information

Reports

Provides access to all reporting tools within MainTasc. Users can select predefined templates, configure filters, and include linked documents. Reports can be printed or exported with custom branding.

Reports

Module information

Reports

The Reports module in MainTasc enables users to generate, customize, and export reports across all project phases. It supports single and batch reporting, integration with documents, and export to PDF, Excel, and other formats. This module ensures that stakeholders receive accurate and timely information tailored to their needs.

Reports

Key Features

Applications

Reports

Contact us

+32 3 295 17 00

Palieterdreef 53

2280 Grobbendonk

Belgium

hello@blueit.eu

Explore SyncTrace for your business

+32 3 295 17 00

Palieterdreef 53

2280 Grobbendonk

Belgium

hello@blueit.eu

Contact us

+32 3 295 17 00

Palieterdreef 53

2280 Grobbendonk

Belgium

hello@blueit.eu

Contact us

+32 3 295 17 00

Palieterdreef 53

2280 Grobbendonk

Belgium

hello@blueit.eu

Contact us

+32 3 295 17 00

Palieterdreef 53

2280 Grobbendonk

Belgium

hello@blueit.eu

Contact us

+32 3 295 17 00

Palieterdreef 53

2280 Grobbendonk

Belgium

hello@blueit.eu

Contact us

+32 3 295 17 00

Palieterdreef 53

2280 Grobbendonk

Belgium

hello@blueit.eu